5 Beds

4,813 sqft

$5,500,000

812 Palm Trail Delray Beach FL, 33483

Price per sqft

$1,142.74

Built in

2025

Property size

4,813 sqft

Property type

Residential

Garages

2

Overview

Additional information

MLS ID

R11020363

Interior features

Total Stories

3


Bedrooms

5


Total Bathrooms

6


Full Bathrooms

5


Half Bathrooms

1


Interior Features

Dining Area, Separate/Formal Dining Room, Dual Sinks, Entrance Foyer, Elevator, Pantry, Separate Shower, Walk-In Closet(s), Loft


Appliances

Dishwasher, Gas Range, Gas Water Heater, Refrigerator, Washer


Floor Description

Hardwood, Tile, Wood


Fireplace

No


Cooling

Yes


Cooling Description

Central Air, Electric, Zoned


Heating

Yes


Heating Description

Central, Electric, Zoned

Exterior features

Lot Size

0.16 Acres


Exterior Features

Balcony, Outdoor Grill, Patio


Lot Features

Sprinklers Automatic, 1/4 Acre


Sewer

Public Sewer


Patio And Porch

Balcony, Open, Patio


Window

Impact Glass

Other property details

Area Name

4220


Taxes

$19,340


Tax Frequency

Annually


Days on Market

301


Garage

Yes


Garage Spaces

2


Parking

Attached, Garage, Two or More Spaces, Garage Door Opener


View

No


County

Palm Beach


Water Source

Public


Pets Allowed

Yes


Pool

Yes


Pool Features

Heated, Pool, Salt Water


Utilities

Electricity Available, Natural Gas Available, Sewer Available, Water Available


55+/Senior Community

No

Listed by: The Corcoran Group
Listing Contact:  

All listings featuring the BMLS logo are provided by Association of Palm Beaches. This information is not verified for authenticity or accuracy and is not guaranteed. IDX information is provided exclusively for consumers’ personal, non-commercial use, that it may not be used for any purpose other than to identify prospective properties consumers may be interested in purchasing, and that the data is deemed reliable but is not guaranteed accurate by MLS.

©2025 Association of Palm Beaches. All rights reserved. 

Data last updated 10:09 PM UTC, 7/10/2025

 

Powered byLuxury Presence